The design of the pit buildings and control tower has been under review for some time, with the resultant design concept being quite stunning and iconic.
The control tower is located in the centre of the pit garages, so that the dummy grid can flow underneath the control tower and on to the pit lane.
There are 32 generous corporate hospitality suites above the pit garage complex. At 5 x 12 metres, the thirty two garages will accommodate two cars each. Each garage will be fully serviced with water, compressed air and electricity.
Construction is beginning shortly!